Pier 27 New Cruise Ship Terminal

  • Location: San Francisco, CA
  • Role: Civil Engineer of Record; QSD/QSP, Survey
  • Agency: Port of San Francisco
  • Estimated Cost: $90,000,000.00
  • Estimated Completion Date: November 2014
  • Client: KMD / Pfau Long Architects Joint Venture

The Pier 27 New Cruise Ship Terminal project will convert the 178,000 square feet existing pier and maritime shed into a new primary, single berth cruise ship terminal. It also includes the development if a plaza located along the Embarcadero between Pier 27 and 29 and modifications to the street and sidewalk configuration along the Embarcadero.

TECI Scope includes: Topographic Survey; Demolition; Utility layout and design on water-side; Grading; Civil Portion of Specifications; Green Strategies; Storm water Management Requirement (QSD/QSP).