Skyline College CIP No. 2

  • Location: San Bruno, CA
  • Role: Civil Engineer of Record
  • Agency: San Mateo County Community College District
  • Final Cost: $60,000,000.00
  • Completed: December 2011

Skyline College campus upgrade is one of the San Mateo County Community College District (SMCCCD) Capital Improvement Program (CIP) No. 2 project. In 2008, TECI was the Master Civil Engineer for the Design-Build team with Hensel Phelps Construction Company for this 106-acre campus wide multi-component upgrade project.

The project consists of: New Buildings were constructed for this project which included:

  • A new Cosmetology, Multi-Cultural Center & Administration Building (Bldg 4, 73,000sf)
  • A new Automotive Transmission building (Bldg 11, 11,500sf)
  • Multiple utility support facilitie    - Review, analysis, rehabilitation and construction of the campus parking and roadway improvements

2) 7 parking lots totaling approximately 12 acres

  • Design & construction of a new code compliant 285-stall parking lot
  • Design of a new campus loop road that includes a new round-about
  • Rehabilitation and repair of service and arterial roadways.
  • Review, analyze and design all campus parking lots to be ADA code compliant.

3) Campus wide utility infrastructure design

4) Campus wide site improvements including:

  • New landscape quad to improve service vehicle & pedestrian access w/in the campus.
  • Improvements to all the campus entrances, including a new Ceremonial Drop off

5) Utility and site construction phasing